Our services span a wide range of industries and we assist clients throughout the continental US, Hawaii, and Alaska, as well as international projects for the US Government.
Below is a sampling of our recent projects.

Rutgers University (New Jersey)

  • Current 5 year preventative maintenance project
  • Installed chilled doors and coolant distribution units (CDUs)
  • Chilled door maintenance includes electrical and operational maintenance
  • CDU maintenance includes electrical, operational and pump maintenance
  • Maintenance performed in accordance with the factory recommended maintenance routines

Safelite Autoglass Maintenance & Installation (Various Locations Nationwide)

  • Annual maintenance and build out contract since 2009
  • Perform maintenance on Safelite AutoGlass locations nationwide
  • UPS maintenance, generator maintenance, testing of UPS and generator alarms
  • Equipment replacement and installations as required
  • Replacements included removal of old UPS or generator equipment

IAP Modular Data Center (Middle East)

  • Turnkey solution
  • Designed and installed fully functional modular data center
  • Made from a standard 20’ conex storage container
  • Independent water-cooled chiller was provided and installed
  • Chiller was interfaced with In-Row HVAC units to provide precision cooling
  • Installed an independent electrical system and UPS to supply power quality
  • Container was used in the Middle East

DIA Makalapa Bldg. 400 Data Center (Hawaii)

  • Designed and installed
  • Removed existing mechanical systems
  • Installed new electrical and mechanical systems for the Data Center buildout
  • Pressure tested all piping
  • Installed new water cooling piping to supply chilled water for the In-Row cooling system
  • Furnished and installed raised flooring and insulated conductor under flooring
  • Furnished, installed and testes shielded CAT 6 cables for StuXureware
  • Provided and installed seismic anchoring

Goodfellow AFB (Texas)

  • Disconnected, removed and disposed of existing electrical system
  • Provided and installed new electrical system
  • Installed two UPS systems and a busway for power quality
  • Provided engineered drawings

Fairchild AFB (Washington)

  • Installed a new generator system to provide power quality
  • Installed a new UPS system to provide power quality
  • Provided temporary generator power until the job was complete
  • Provided demo and removal

Fort Campbell Army Base, Room 134 (Kentucky/Tennessee)

  • Delivered, rigged and installed power quality equipment
  • Fabricated manifold in mechanical room
  • Provided and installed chilled water piping for precision cooling
  • Pressure tested all PEX piping
  • Provided and installed a new electrical distribution system
  • Provided and installed a clean agent fire suppression system per manufacturers requirements

The Point Casino (Washington)

  • Provided demo, removal and disposal of existing electrical system and HVAC unit
  • Rigging for demo and uncrate and set new UPS, MBS and battery cabinets
  • Installed duct work and mounted HVAC package
  • Furnished and installed all wiring and UPS system to provide power quality

VBA Winston Salem (North Carolina)

  • Multi-floor demo and remodel
  • Design and installed
  • Computer room relocation
  • Electrical infrastructure installation
  • Installed wall mounted split air conditioner systems
  • Installed and tested the Structured Cabling
  • Installed Audio Visual and Access Control Systems

VA Los Angeles (California)

  • Design solution for computer room
  • Solution included dry cooler installation, MDF Infrastructure and IDF Closet
  • Computer room installation and commissioning
  • Provided and installed a diesel generator, ATS and UPS for power quality
  • Installed a redundant dry cooler and pump package for precision cooling system
  • Ground IT cabinets, UPS, cooling units and phone switch
  • Provided complete turnkey project management and installation

VA Medical Center Lake Nona (Florida)

  • Installed supply and return tubing for precision cooling system
  • Provided and installed condensate manifold, pump and drainage piping for precision cooling system
  • Pressure tested and insulated all lines
  • Provided and installed a support system for the chilled water delivery
  • On-site project management

VBA Detroit (Michigan)

  • Multi-floor demo and remodel
  • Design and installed
  • Computer room relocation
  • Electrical infrastructure installation
  • Installed wall mounted split air conditioner systems
  • Installed and tested the Structured Cabling
  • Installed Audio Visual and Access Control Systems

Navy Submarine Bridge Trainer – Pearl Harbor (Hawaii)

  • Design electrical and mechanical installation
  • Furnished and installed circuits and wiring for the electrical system
  • Extended and insulated chilled water piping for In-Row Cooling Units for precision cooling system
  • Fabricated and installed under raised floor main/bypass strainers and supply/return headers
  • Provided and installed seismic anchoring

Lockheed Misawa Data Centers (Japan)

  • Installed the new electrical system
  • Provided and installed two UPS systems to provide power quality
  • Provided and installed structured cabling
  • Provided and installed seismic anchoring

Camp Zama Army Base (Japan)

  • Designed total turnkey data center demolition and reconstruction
  • Provided engineered electrical, mechanical, structural drawings and construction documents
  • On-site project management
  • Shipped all equipment to project site
  • Demoed, removed and disposed of all existing equipment
  • Furnished and installed new electrical and mechanical systems
  • Provided and installed fiber optic cabling, terminated and tested
  • Demoed, furnished and installed lighting and anti-static flooring
  • Furnished and installed humidifier and fire suppression system
  • Provided startup and assembly for all equipment